Many thanks to the whole FKN-team!! Great job!
EUREF 17 – Gasometer, Berlin – The last façade unit has been installed
On Mach 16th, the last façade unit was installed at the EC17 Gasometer Building at the EUREF-Campus Berlin, Germany.
FKN News
On Mach 16th, the last façade unit was installed at the EC17 Gasometer Building at the EUREF-Campus Berlin, Germany.
Many thanks to the whole FKN-team!! Great job!