Search Results

81 results:
Eclipse Düsseldorf – The last element has been installed  
On 18. May 2022, the last element was installed at Eclipse in Düsseldorf, Germany. Many thanks to everyone for the great collaboration in this project.  
Façades  
We create new large-scale projects or revitalise older buildings by refurbishing them with our façade elements. With our high-level of production know how, the innovative in-house design…  
e-coFACE  
This new, high-performance insulation technology has a number of outstanding properties; chief amongst them is the system’s overall classification of “A2-s1,d0” according to BS EN 13501, which…  
Office Building Complex Eschborn Gate in Eschborn, Germany  
Our new project.
At the entrance to the South industrial area, a modern, attractive Building Complex with diverse and flexible use possibilities is being built.
 
EUREF Haus 17 – Gasometer in Berlin  
The Visual Mock-UP was set up on side of Euref Haus 17 in Berlin.  
Projects  
AXA Kaiserlei Offenbach/M. AXA Abraham Lincoln Park Wiesbaden Federal Reserve Bank Bonn Development Center Bosch Abstatt Axel Towers Copenhagen Bosch Research Campus Renningen KfW…  
Eclipse Düsseldorf  
Project:  ECD - Eclipse, Düsseldorf Client:  die developer - Eclipse Düsseldorf GmbH, Düsseldorf Main contractor:  Dreßler Bau GmbH, Aschaffenburg Architekt:  HPP Architekten…  
Eclipse Düsseldorf – progress of construction  
February 2022
We are pleased to show you the current construction progress of the Eclipse building in Düsseldorf, Germany.
 
FAZ Frankfurt – The last element has been installed  
On 04. Februar 2022, the last element was installed at FAZ – Europa-Allee in Frankfurt, Germany. Many thanks to everyone for the great collaboration in this project.  
Your application  
Thank you for your application Please note the data protection information for applications at this point. After reviewing your application, we will contact you as soon as possible. We ask for…